Sort By:
Precision collet sets 472EP | ER40 | 16 parts in wooden box DIN 6499 B (ISO 15488 B)
EU warehouse, 2–3 weeks
Protection plastic plug - form Z2 Z2 - 16 - 13
EU warehouse, 2–3 weeks
Protection plastic plug - form Z2 Z2 - 20 - 16
EU warehouse, 2–3 weeks
Protection plastic plug - form Z2 Z2 - 30 - 16
EU warehouse, 2–3 weeks
Protection plastic plug - form Z2 Z2 - 40 - 20
EU warehouse, 2–3 weeks
Protection plastic plug - form Z2 Z2 - 50 - 20
EU warehouse, 2–3 weeks
Protection steel plug - form Z2 Z2 - 25 x 16
EU warehouse, 2–3 weeks
Protection steel plug - form Z2 Z2 - 30 x 16
EU warehouse, 2–3 weeks
Protection steel plug - form Z2 Z2 - 40 x 20
EU warehouse, 2–3 weeks
Pull studs "lid" | M16 | LID Asymmetrical thread S 20 x 2
EU warehouse, 2–3 weeks
Pull studs ~ISO 7388-3 | Form AD | M16 | with drill through | including O-ring 402.20.16.21
EU warehouse, 2–3 weeks
Pull studs ~ISO 7388-3 | Form AD | M16 | with drill through | including O-ring 402.20.16.25
EU warehouse, 2–3 weeks
Pull studs ~ISO 7388-3 | Form AD | M16 | with drill through | including O-ring 402.20.16.26
EU warehouse, 2–3 weeks
Pull studs ~ISO 7388-3 | Form JD | M12 | 60° | with drill through | without O-ring
EU warehouse, 2–3 weeks
Pull studs ~ISO 7388-3 | Form JD | M16 | 60° | with drill through | including O-ring
EU warehouse, 2–3 weeks
Pull studs ~ISO 7388-3 | Form JD | M16 | 90° | with drill through | including O-ring
EU warehouse, 2–3 weeks
Pull studs ~ISO 7388-3 | Shape UD | M16 | with drill through | including O-ring
EU warehouse, 2–3 weeks
Pull studs CAT metric | M16 | for high pressure cooling
EU warehouse, 2–3 weeks
Pull studs CAT metric | M24 | for high pressure cooling
EU warehouse, 2–3 weeks
Pull studs CAT metric | type “MAZAK” | M16 | Shape UD | with drill through | including O-ring
EU warehouse, 2–3 weeks
Pull studs CAT metric | type “MAZAK” | M24 | Shape UD | with drill through | including O-ring |
EU warehouse, 2–3 weeks
Pull studs DIN 2080 with Ott-groove | M24 | with internal thread and drill through
EU warehouse, 2–3 weeks